Wood wharf case study

In collaboration with:

Canary Wharf Group PLC

£190K

Annual cost savings

36,000

KG CO2 saved

580

Additional deliveries captured

Introduction

A mixed use, water side community development seeking FSC timber certification. To help the team keep track, they needed to digitise the flow of data on the project. Here is how they did it!
Canary Wharf Contractors is an industry leading firm that sets challenging goals in the pursuit of excellence. One of these goals is the internal requirement that all projects operated by Canary Wharf Contractors must be 100% FSC certified. Responsible sourcing is a corner stone of sustainable construction and the achievement of such a certification comes with certain obstacles.

The challenge

In order to achieve FSC certification, 100% of the timber that goes into the build must be FSC certified and the contractor must be able to provide evidence of this. If as much as one of the hundreds of timber deliveries to site is uncertified and slips through the cracks, the project will fail its certification and all that work will have been in vain. The Canary Wharf Contractors team are commitment to achieving this sustainability target, and will replace the uncertified timber even if it requires rework. The additional cost and time commitment had become a burden on the project team so they sought out a better way.

“By adopting the Qflow system we were able to achieve our FSC certification with ease and it saved us thousands of pounds in the process. We are delighted with what the team at Qflow have done for the Wood Wharf project”

– Andy Haigh, Senior Sustainability Manager, Canary Wharf Contractors

The Solution

To solve this issue, the Wood Wharf project team needed to be alerted if uncertified timber was delivered to site, and ensure that the correct documentation was available for FSC audits. Qflow stepped in and deployed its innovative data capture and analytics tool to solve this problem. This alerted the team to uncertified deliveries so that they could act to eliminate that risk. By keeping a constant eye on all deliveries, Qflow enabled the project to run smoothly and minimise delays and unnecessary costs due to required rework.
To read more about how Qflow did this, the technology used, and the many additional benefits that Canary Wharf Contractors experienced as a direct result of deploying Qflow, download the full case study.

Download full case study here

Speak with our expert sales team to book a demo

Enabling responsible, resource efficient construction; cutting waste and carbon. Qflow automates on site data capture and auditing, feeding it into your existing tools

Get your free sustainability score today

Take our 2-minute quiz and we’ll send you a free report showing your sustainability readiness and what you can do to track, measure and reduce as-build project carbon